Construction and fit out of a new IT training building accommodating staff and student facilities. The building is a two storey structure with curtain wall glazed façade to two elevations and coloured concrete tilt-up panel and steel construction to the remainder of the building.The fitout includes toilet facilities, lecture and practical rooms for staff and students. Part of the contract includes the replacement of main transformers and switchboards servicing adjoining university buildings.

The site is located next to a child care centre and there are strict provisions that need to be adhered to regarding noisy working and environmental constraints. Pyramid investigated various construction methodology during the tender period and offered our Client a substantial reduction in the construction timeframe.

The works also includes access roads, car parking areas and landscaping.